Numerous projects have required intricate site, soils and foundation work.
They feature:
- Blasting, ledge removal and measures for unsuitable soils
- Water table and wetlands considerations
- Pad preparation
- Grade beams, piles, and structural slabs
- Construction of retaining walls, spillways, and retention basins
Clients and features include:
- Ferrous Technologies - Piles and grade beams
- Foster-Miller - Structural slab for U.S.Navy
- RCN - ERA and local conservation group interface. Site adjacent to river/wetlands
- Ruby Wines - Ledge removal for 40,000 s.f. structure
- Sarah Michaels - 250 tons of blast and removal
|
|
|