ADAPTIVE REUSE - RELIGIOUS

Interfaith Center

Photo

This project was a complete gut renovation with extensive structural requirements due to original trusses having been compromised over time.

A complicated exterior waterproofing system with passive drainage and one sided foundation walls poured against the original rubble foundation allowed for an off ice suite and meeting rooms with a high level of finish to be built in the lower level in what had been a damp mechanical space.

Intricate millwork highlighted the foyer. ADA upgrades included an elevator and fully accessible bathrooms.